This is 2-Smooth’s check list when installing concrete. Please be aware when you are comparing other quotes are as thorough as we are!
- The site clear of all debris and fully compacted
- 200mm Black polythene membrane to be laid to stop ants, weeds, moisture.
- Every square metre of concrete has steel mesh installed and tied correctly. This will help bond the centre of the slab together.
- Foam expansion installed to assist in the drying process to help minimise offset cracking.
- All control joints or pattern cutting is done via machine.
- The concrete is to be pressure cleaned or acid washed, than allowed to dry for approx. 48hrs before using a high quality solvent sealer.
-
1) Bobcat Earthworks 2) Levels & Compaction 3) Polythene/Mesh & Formwork 4) Installed/ Machine Cut/Wash & Sealed